Total Austral awarded MMA with a 2 years long minimum period contract to provide 10ksi Integral Compact Wellheads for Shale Gas wells in Neuquén´s fields. These equipment includes Rotating type Mandrel Hangers with snap ring system and premium threads connections.
Also, the WH offers option for on-line & off-line cementing job. These Wellheads are designed for hydraulic fracking operations up to 15ksi.
The provision includes 4-1/16” production tree with hydraulic actuators.